News 
Latest Case Study - St Andrews Court
Case Study - February 2017
St Andrews Court in Huddersfield.
A new development of 11 commerical units required suitable drainage. Clark Drain supplied over 170 metres of heavy duty technical channel and 30 ductile iron double triangular covers & frames.
The requirement was for suitable drainage to be able to cope with a wide range of industrial traffic including forklifts turning and HGV vehicles.
The details include why the products were chosen and why Clark-Drain was the chosen supplier.
Read more
- Uploaded 09/02/2017